Northshore Reconstruct - Project Update 6/26
Good Afternoon,
Construction is continuing to make progress this week. Looking ahead for next week, construction should be moving west of Penrose Drive. Affected property Owners will be notified again before any new changes in access or loss of garage/driveway access during working hours. Please read on below for additional details:
Past Week Construction Activities
The Utility Contractor has:
Completed a water main tie-in at the east end of the project.
Installed 7 water services on the new water main.
Installed 24" storm sewer pipe from east to west along Northshore drive, this included 2 inlets and a junction box.
The Grading Contractor has:
Removed existing driveways along Northshore Drive from Penrose to the west end of the project.
Salvaged the existing gravel along Northshore Drive from Penrose to the west end of the project.
Weekly Progress Photos
Upcoming Construction Activities
The Utility Contractor will:
Start storm sewer construction from Penrose to the west end of the project.
Move existing hydrants and install new hydrants at those locations.
The Grading Contractor will:
Finish removing the remaining gravel subbase on Northshore west of Penrose
Maintain or reconstruct temporary construction access paths as needed
Begin subgrade preparation on Northshore between Leisure Lane and Penrose Drive.
Access Updates
Residents on the south side of Northshore Drive will have intermitted access to driveways. The Project team will try to communicate the temporary loss of access so Residents can plan ahead.
Northshore will remain closed to all through traffic unless otherwise notified. Through traffic shall continue to use to the Highway 105 Detour.
Penrose Residents will continue to utilize detour route and the temporary gravel access path from west end of construction limits.
Residents west of Penrose on Northshore will utilize detour route and temporary gravel access path from west end of construction limits. Residents on south side may not have garage/driveway access during working hours as storm sewer progresses west.
Residents east of Penrose on Northshore will utilize temporary gravel paths from east end of construction limits. Residents on south side may not have garage/driveway access during working hours as subgrade stabilization progresses west.
If you have any questions or concerns, please do not hesitate to contact our project team. Thank you for your patience and cooperation as we continue progressing on this project.


